And the steel arrived...

And so the great day arriveth…

The beautiful, beautiful steel finally arrived. All trades work was finally dome and we could install the new steel in a well lit, insulated, heated and powered up facility!

After we unloaded 3 flat bed trucks full of steel and arranged them on the floor, we measured everything, marked on the floor where they would sit and began drilling. The holes in the concrete would house the epoxy and threaded rod to be used as anchors for all the steel.

Once they cured over night, we started playing I-Beam LEGO and bolted all the components together. They fit like a glove, a 2000 pound glove :)